Technology for the design and manufacturing of related auxiliary equipment in the power, oil and gas, petrochemical, water, and other industries

MAPNA Boiler and Equipment Engineering and Manufacturing Company is a capable, knowledge-based enterprise operating on an EP and EPC basis in domestic and international markets. The company specializes in the design, procurement, manufacturing, installation, and commissioning of various types of heat recovery steam generators (HRSG) / combined heat and power (CHP) systems, water-tube boilers (package, industrial, and utility-scale), and associated auxiliary equipment across the power, oil and gas, petrochemical, water, and other industrial sectors. Committed to corporate social responsibility, the company creates value for all stakeholders, prioritizing social accountability, economic dynamism, and environmental sustainability toward sustainable development in alignment with national interests. In line with national policies and development program objectives regarding the design and fabrication of Heat Recovery Steam Generators (HRSGs), a technology transfer agreement was concluded with South Korea’s DOOSAN in 2003, on the basis of which more than 160 HRSG units have been commissioned or are currently under execution.

Furthermore, in the field of industrial boilers, collaborations with Italy’s Macchi and Canada’s Thermodesign have led to the acquisition of technology for the design, manufacturing, installation, and commissioning of industrial boilers, with more than 40 boiler units commissioned or currently under execution for clients. To meet the new demands of the power market, the company signed a contract in 2016 for technology transfer and licensing of high-capacity heat recovery steam generators (HRSGs) downstream of F-class, H-class, and higher gas turbines with the renowned Belgian company John Cockerill (CMI).

Additionally, in the field of potable and industrial water supply, this company is responsible for the design, procurement, fabrication, installation, and commissioning of pre-treatment, treatment, and desalination systems utilizing membrane technologies, including RO and EDI, within MAPNA Group, and is prepared to submit competitive proposals to clients in this sector.

1114

Specialized personnel

73

Mega national project

27

Years of experience

Members of the Board of Directors

Mohammad Nabi Faraji

Chairman of the Board of Directors

Fardin Shahriari

Vice Chairman of the Board of Directors and Managing Director

Mohammad Hadi Faghihzadeh

Board Member

Ali Kalantari Ghoreishi

Board Member

Ali Ashraf Khoramani

Board Member

Outlook

A leader in energy transition and decarbonization, capable in developing oil, gas, and petrochemical plants, and prominent in the water industry

Mission

As a member of MAPNA Group, we play a key role in creating sustainable value for customers, shareholders, and other stakeholders by delivering comprehensive solutions in fluid systems with a focus on water and steam, heat recovery systems, and equipment across power plant, water, oil, gas, petrochemical, and other industrial sectors.

Raison d'être

Our modern knowledge puts industry at the service of the environment.

Values

MAPNA Group Organizational Values: "From Me to We"

History

1378
Phase 1
Company Incorporation

Establishment of Mesba Company

Project execution with construction constraints

1382
Phase 2
Knowledge Transfer

Transfer of HRSG boiler technical know-how and establishment of a design and engineering core

Equipping for the execution of the 44-unit HRSG mega-project

Focus on project management cores

1386
Phase 3
Capacity expansion

Focus on increasing the design and procurement capacity of power plant heat recovery steam generators (HRSGs) within the framework of the NIAM and 40-Boiler schemes

Focus on project management core capabilities (transitioning the company into a multi-project enterprise) and procurement (expanding the procurement scope in projects)

1389
Phase 4
Manufacturing of main boiler equipment

Entry into the manufacturing of main boiler and power plant equipment through merger with MAPNA Equipment Company (Neyrpars)

Product portfolio development

Entry into the field of research and development and establishing capabilities for designing new products

Enhancing services and customer relations

1393 to 1396
Phase 5
Management Development

Implementation of the Enterprise Resource Planning (ERP – SAP) system

Development of strategic management and execution of functional strategies

Technical knowledge transfer of Class F, Class H, and higher horizontal and vertical heat recovery boilers

Entry into the water desalination sector

1396 to 1400
Phase 6
Product Development

Entry into the engineering and manufacturing of membrane desalination equipment and portable and stationary power plant water treatment packages

Transfer of technical knowledge for the design and manufacturing of EDI systems

Development of domestic manufacturing capabilities for duct burners, stack dampers, and silencers

Execution of a pilot project for the design and construction of a demineralized water production plant from wastewater

Commencement of operations at the Elahieh Complex finned tube production workshop

From 1400 to present
Phase 7
Market Development

Expanding the company's mission to the entire fluids domain, including hydrogen production and storage

Developing product portfolio diversification based on the product roadmap

Expanding business strategies beyond MAPNA Group

Scroll to Top